Print preview Close

Showing 177 results

archival descriptions
Greater Winnipeg Water District Aqueduct (Winnipeg, Man.) With digital objects
Print preview Hierarchy View:

Backfilling section of aqueduct between Prawda and McMunn

Photograph of engineers standing next to a completed section of the Winnipeg Aqueduct being backfilled by a dragline, somewhere between Prawda, Manitoba, and McMunn, Manitoba. From left to right: Engineer of Design Maxwell V. Sauer (at aqueduct), Division Engineers George F. Richan and C.J. Bruce, and unknown. Photographer is unknown.

Greater Winnipeg Water District

Aqueduct officials party at Indian Bay

Photograph of Winnipeg Aqueduct officials and their families having a picnic at Indian Bay. The men in the foreground, from left to right: unknown, Controller John James Wallace, Controller John William Astley, "Irving" [caption on negative], St. Boniface Mayor John Power Howden[?], "Shamin" [caption on negative], unknown. Photographer unknown.

Greater Winnipeg Water District

Party in Tunnel under Red River

Photograph of Greater Winnipeg Water District officials, engineers, and their families at the east end of the Winnipeg Aqueduct tunnel below the Red River linking downtown Winnipeg to St. Boniface. From left to right: Chief Engineer William G. Chace, Harriet Lily Waugh (née Logan), possibly Effie Waugh, and Division Engineer J. Armstrong. Photographer is unknown.

Greater Winnipeg Water District

Results 141 to 160 of 177