Brokenhead River siphon
Chief Engineer Chace in aqueduct arch
Soil test for aqueduct near Brokenhead River
Concrete section of aqueduct near Spruce Siding
Dredge excavating for aqueduct east of Deacon
Mixer site next to GWWD rail siding east of East Braintree
Front wall of aqueduct's intake at Indian Bay
Walls of Taché surge tower from above
Seine River aqueduct crossing
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street
Bathing beach at Waugh
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, No. 2 Mixer
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, General Progress
William Smaill Photo Album – Page 2
Horse-drawn cart and Winnipeg Hydro float
Winnipeg Waterworks Department float
Greater Winnipeg Water District, Lord Selkirk Association-Old Kildonan, and MTS floats