Lowering 36” City pipe line under CPR subway crossing
City pipe line raised by rains
Valve ready to be placed – 36” City pipe line
36” City pipe line – valve at turn near well number 1
Bend at well number 1 – 36” City pipe line
Flooded trench – likely for City pipe line
Flooded trench – 36” City pipe line
Flooded trench – likely for City pipe line
Building the Shoal Lake Aqueduct
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, No. 2 Mixer
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, General Progress
Number 33 - Compressor at high pressure plant
J. W. Swan
L. E. Fenton
D. W. (Bud) Steuart
[Water Works employee]
Winnipeg Water Works, 1871
Greater Winnipeg Water District float
Winnipeg Waterworks Department float
Greater Winnipeg Water District, Winnipeg Rotary Club, and other floats