Digging trench for 36” City pipe line
View of City pipe line with 36” pipe
Connecting pipe – City pipe line
View of City pipe line
View of City pipe line and company’s camp
Digging trench for 36” City pipe line
Valve – 36” pipe line
Lowering 36” City pipe line under CPR subway crossing
Valve ready to be placed – 36” City pipe line
Floods from rain storm – City pipe line
Digging out pipe raised by rain
Laying 36” pipe under CPR subway
Lowering 36” City pipe line under CPR subway crossing
Bend at well number 1 – 36” City pipe line
Bend at well number 1 – 36” City pipe line
36” City pipe line – valve at turn near well number 1
36” pipe line bend at City well number 1
Placing valve for 36” City pipe line at well number 1
Building Tuxedo Park sewer
Building Tuxedo Park sewer