Aqueduct drag line between East Braintree and Shoal Lake
- i01217
- Item
- 1917
Photograph of a dragline working on the Winnipeg Aqueduct between East Braintree, Manitoba, and Shoal Lake. Photographer is unknown.
Greater Winnipeg Water District
185 results with digital objects Show results with digital objects
Aqueduct drag line between East Braintree and Shoal Lake
Photograph of a dragline working on the Winnipeg Aqueduct between East Braintree, Manitoba, and Shoal Lake. Photographer is unknown.
Greater Winnipeg Water District
Pouring aqueduct pipes at plant in Transcona
Photograph of two pipes for the Winnipeg Aqueduct being poured at Canada Lock Joint Pipe Ltd. in Transcona. Photograph taken by T.H. Kirby.
Greater Winnipeg Water District
Bending invert steel reinforcing for aqueduct south of Anola
Photograph of invert steel reinforcing for the Winnipeg Aqueduct being bent according to a template south of Anola, Manitoba. Division Engineer C.J. Bruce is at centre with his hands on his hips. Photographer is unknown.
Greater Winnipeg Water District
Soil test for aqueduct near Brokenhead River
Photograph of a soil test for the Winnipeg Aqueduct near Brokenhead River, east of Ross, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Box drains for aqueduct between East Braintree and Shoal Lake
Photograph of workers putting in box drains for a section of the Winnipeg Aqueduct between East Braintree, Manitoba, and Shoal Lake. Photographer is unknown.
Greater Winnipeg Water District
Riprapping west side of Falcon River Diversion Dyke at Indian Bay
Photograph of workers riprapping the west side of the Falcon River Diversion Dyke at Indian Bay. Photographer is unknown.
Greater Winnipeg Water District
Dragline backfilling aqueduct south of Anola
Photograph of a dragline backfilling a section of the Winnipeg Aqueduct south of Anola, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Aqueduct drainage siphon near Meadowvale
Photograph of workers next to a Winnipeg Aqueduct drainage siphon near Meadowvale, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Backfilling section of aqueduct between Prawda and McMunn
Photograph of engineers standing next to a completed section of the Winnipeg Aqueduct being backfilled by a dragline, somewhere between Prawda, Manitoba, and McMunn, Manitoba. From left to right: Engineer of Design Maxwell V. Sauer (at aqueduct), Division Engineers George F. Richan and C.J. Bruce, and unknown. Photographer is unknown.
Greater Winnipeg Water District
Device for moving aqueduct arch forms near Spruce Siding
Photograph of workers using a contractor's device for moving outside arch forms of the Winnipeg Aqueduct near Spruce Siding, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Winnipeg Aqueduct arch forms near Spruce Siding
Photograph of forms for arch sections three and five of the Winnipeg Aqueduct near Spruce Siding, Manitoba. Photograph taken by William G. Chace, Chief Engineer of the Winnipeg Aqueduct.
Greater Winnipeg Water District
Excavating Falcon River Diversion Canal at Shoal Lake
Photograph of a dredge excavating the Falcon River Diversion Canal between Indian Bay and Snowshoe Bay, with consulting Engineer James H. Fuertes standing to the right. Photograph is looking northwest and the photographer is unknown.
Greater Winnipeg Water District
Placing material on Falcon River Diversion Dyke at Indian Bay
Photograph of workers using a scow to place material from cars onto the Falcon River Diversion Dyke at Indian Bay. Photograph taken by William G. Chace, Chief Engineer of the Winnipeg Aqueduct.
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District