Showing 48 results

archival descriptions
Block, Morris Public utilities With digital objects
Print preview Hierarchy View:
Trench for City pipeline
Trench for City pipeline
Buildings and water tower of Union Stock Yards
Buildings and water tower of Union Stock Yards
Alderman Midwinter and trenching machine at City well number 8
Alderman Midwinter and trenching machine at City well number 8
Lowering 36” City pipe line into trench
Lowering 36” City pipe line into trench
View of City pipe line with 36” pipe
View of City pipe line with 36” pipe
Connecting pipe – City pipe line
Connecting pipe – City pipe line
View of City pipe line
View of City pipe line
View of City pipe line and company’s camp
View of City pipe line and company’s camp
City pipeline raised by rain
City pipeline raised by rain
City pipeline raised by rain near well number 3
City pipeline raised by rain near well number 3
Excavating frozen earth at City pipe line
Excavating frozen earth at City pipe line
Lowering pipe into trench – City 36” pipe line
Lowering pipe into trench – City 36” pipe line
Digging trench for 36” City pipe line
Digging trench for 36” City pipe line
City pipe line – rain water running through ditch
City pipe line – rain water running through ditch
36” City pipe line – valve at turn near well number 1
36” City pipe line – valve at turn near well number 1
Flooded trench – likely for City pipe line
Flooded trench – likely for City pipe line
Train cars at Union Stock Yards
Train cars at Union Stock Yards
Work being done near water tower at Union Stock Yards
Work being done near water tower at Union Stock Yards
Trench machine and camps – City 36” pipe line
Trench machine and camps – City 36” pipe line
Floods from rain storm – City pipe line
Floods from rain storm – City pipe line
Results 1 to 20 of 48