- i02914
- Item
- 7 Aug. 1922
View of bathing beach at Waugh, looking south along beach. Image derived from glass lantern slide.
Greater Winnipeg Water District
View of bathing beach at Waugh, looking south along beach. Image derived from glass lantern slide.
Greater Winnipeg Water District
Passengers aboard GWWD Railway Service car at St. Boniface Station
Passengers aboard GWWD Railway Service car at St. Boniface Station. Image derived from glass lantern slide.
Greater Winnipeg Water District
Intake - View of unwatered cofferdam
Contract 35 - Mile 97.5 - Intake - View of unwatered cofferdam from Sta. 5152 in coffer.
Greater Winnipeg Water District
Intake - filling last gap in cofferdam between the dykes
Contract 35 - Mile 97.5 - Intake - Filling last gap in cofferdam between the dykes. Viewed from west dyke.
Greater Winnipeg Water District
Handmucking between the pole piling
Contract 34 - Mile 92.5 - Camp 7 - Slide at Sta. 4886. Hand mucking between the pole piling. (see image 900)
Greater Winnipeg Water District
Party in Tunnel under Red River
Contract 56 - Mile 3.5 - Red River Crossing - Chief Engineer William G. Chase, Mrs. R.D. (Harriet) Waugh, G.W.W.D. Commisioner Richard Deans Waugh, (possibly) Effie Waugh, and Division Engineer J. Armstrong at East Shaft
Greater Winnipeg Water District
Looking East over the Red River Trestle
Contract 56 - Mile 3.5 - Red River Crossing - View east over Red River trestle, showing well structure (Taché surge tower) and concreting tower.
Greater Winnipeg Water District
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
Well excavation timbered to floor
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District
View of route of 66" diameter reinforced concrete pipe line from concrete tower
Contract 55 - Mile 3.6 - View of route of 66 inch diameter reinforced concrete pipeline (on Rue Arnaud, Rue St. Joseph and Rue Aubert) from concreting tower of Contract 56. Canadian National Railway main line cuts through upper half of image, and Seine R
Greater Winnipeg Water District
Driving Piles at Seine River Crossing of 66" Pipe Line
Contract 55 - Mile 4.4 - Driving piles at Seine River crossing of 66 inch pipeline. Note pipes.
Greater Winnipeg Water District
Intake - entrance showing channel, skimming, and front wall
Contract 35 - Mile 97.5 - Intake entrance showing channel, skimming and front wall. Looking westward.
Greater Winnipeg Water District
General View of Well Walls from Above
Contract 56 - Mile 3.5 - Red River Crossing - General view from concreting tower of walls of well structure (Taché surge tower).
Greater Winnipeg Water District
Contract 55 - Mile 4.4 - Seine River crossing, looking northeast from CNR toward Rue Notre Dame.
Greater Winnipeg Water District
Permeability test apparatus. Concrete test samples at lower left side.
Greater Winnipeg Water District
Intake - Last train to cofferdam fill
Contract 35 - Mile 97.5 - Intake - Last train to cofferdam fill. View taken from rock cut. Note riprap on east dyke.
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Tunnel shaft of Red River Crossing
Tunnel shaft of Red River Crossing.
Greater Winnipeg Water District