115, Buffalo Springfield Roller, St. Mary and Carlton
- i01616
- Item
- 1948
124 results with digital objects Show results with digital objects
115, Buffalo Springfield Roller, St. Mary and Carlton
#2, P.R.M., Westminster and Canora - 1947
William Smaill Photo Album – Page 32
Part of William Smaill fonds
Captions read: Concrete mixers, mile 77.
Smaill, William
William Smaill Photo Album – Page 36
Part of William Smaill fonds
Captions read: Culvert, mile 77 - In muskeg, mile 58 - Ditch after heavy rain, mile 57 - Muskeg, mile 58 - Shaping bottom for inverts camp, mile 57.5.
Smaill, William
William Smaill Photo Album – Page 37
Part of William Smaill fonds
Captions read: Blaw Forms - Camp 2, Mile 57, Rear View - 8 foot clear muskeg - Camp 2, front view.
Smaill, William
William Smaill Photo Album – Page 40
Part of William Smaill fonds
Captions read: Dump ready for track - Inside of Aqueduct, mile 65 - Handling pads - Concrete train camp 3, mile 65 - Moving inside forms - First arch poured, mile 64 - Traveler moving the outside forms - Ready for pouring invert.
Smaill, William
William Smaill Photo Album – Page 43
Part of William Smaill fonds
Captions read: Close view, mixer plant, mile 64 1/2 - Mixer plant and completed aqueduct, mile 64.5.
Smaill, William
William Smaill Photo Album – Page 45
Part of William Smaill fonds
Captions read: Moving dragline and outfit back to backfill at camp 3, mile 66.
Smaill, William
William Smaill Photo Album – Page 62
Part of William Smaill fonds
Captions read: Among the stumps and Boulders, camp 1 - Hard digging.
Smaill, William
William Smaill Photo Album – Page 63
Part of William Smaill fonds
Captions read: Camp 1 - Taking train up a 4% grade.
Smaill, William
William Smaill Photo Album – Page 80
Part of William Smaill fonds
Captions read: Mile 58 - Backfilling, mile 65 - Mile 85 - Station mens hut, mile 70.
Smaill, William
William Smaill Photo Album – Page 84
Part of William Smaill fonds
Captions read: Backfilling Camp 4, Mile 71.
Smaill, William
William Smaill Photo Album – Page 93
Part of William Smaill fonds
Captions read: Backfilling, camp 5, mile 77 - Backfilling, camp 1, mile 51 plus .
Smaill, William
William Smaill Photo Album – Page 94
Part of William Smaill fonds
Captions read: Camp 2 - Camp 3 - Camp 3 - Camp 2 - Camp 2 - Moving dragline to backfill, 1915.
Smaill, William
William Smaill Photo Album – Page 102
Part of William Smaill fonds
Captions read: Camp 2, mile 57 - Culvert - Camp 2- Mile 58.
Smaill, William
William Smaill Photo Album – Page 104
Part of William Smaill fonds
Captions read: Moving outside forms - Rails to hold sheeting - hand excavation in hardpan -Backfilling - 1st foundation fill - Rock Cut - Hardpan sloughed into trench after rain - Camp 4, mile 71 - Traveller.
Smaill, William
Aqueduct drag line between East Braintree and Shoal Lake
Photograph of a dragline working on the Winnipeg Aqueduct between East Braintree, Manitoba, and Shoal Lake. Photographer is unknown.
Greater Winnipeg Water District
Driving piles into Seine River for aqueduct
Photograph of piles being driven into the Seine River for the Winnipeg Aqueduct, north of Provencher Boulevard. Photographer is unknown.
Greater Winnipeg Water District
Dredge excavating for aqueduct near Meadowvale
Photograph of a dredge excavating for the Winnipeg Aqueduct near Meadowvale, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Dredge excavating for aqueduct south of Anola
Photograph of a dredge excavating for the Winnipeg Aqueduct south of Anola, Manitoba. Photographer is unknown.
Greater Winnipeg Water District