Empty cofferdam for aqueduct intake near Indian Bay
- i01222
- Pièce
- 1918
Fait partie de Greater Winnipeg Water District fonds
Photograph of an empty cofferdam near the Winnipeg Aqueduct's intake at Indian Bay. Photographer is unknown.
Sans titre
177 résultats avec objets numériques Afficher les résultats avec des objets numériques
Empty cofferdam for aqueduct intake near Indian Bay
Fait partie de Greater Winnipeg Water District fonds
Photograph of an empty cofferdam near the Winnipeg Aqueduct's intake at Indian Bay. Photographer is unknown.
Sans titre
Filling in cofferdam for aqueduct's intake at Indian Bay
Fait partie de Greater Winnipeg Water District fonds
Photograph of dump cars filling in last gap of a cofferdam between dykes at the intake of the Winnipeg Aqueduct at Indian Bay, taken from the west dyke. Photographer is unknown.
Sans titre
Clearing debris for aqueduct west of Snake Lake
Fait partie de Greater Winnipeg Water District fonds
Photograph of workers clearing debris between pole piling for the Winnipeg Aqueduct west of Snake Lake. Photographer is unknown.
Sans titre
Party in Tunnel under Red River
Fait partie de Greater Winnipeg Water District fonds
Photograph of Greater Winnipeg Water District officials, engineers, and their families at the east end of the Winnipeg Aqueduct tunnel below the Red River linking downtown Winnipeg to St. Boniface. From left to right: Chief Engineer William G. Chace, Harriet Lily Waugh (née Logan), possibly Effie Waugh, and Division Engineer J. Armstrong. Photographer is unknown.
Sans titre
Looking east over Red River trestle bridge
Fait partie de Greater Winnipeg Water District fonds
Photograph of a Red River trestle bridge between downtown Winnipeg and St. Boniface, looking east towards the Taché surge tower. Photographer is unknown.
Sans titre
Pouring piers for Taché surge tower
Fait partie de Greater Winnipeg Water District fonds
Photograph of workers pouring piers for the Taché surge tower. Photographer is unknown.
Sans titre
Excavated and timbered Taché surge tower
Fait partie de Greater Winnipeg Water District fonds
Photograph of workers excavating the Taché surge tower, which is timbered to the floor. Photographer is unknown.
Sans titre
Aqueduct's route through St. Boniface
Fait partie de Greater Winnipeg Water District fonds
Photograph of the route of the Winnipeg Aqueduct's 66 inch diameter reinforced concrete pipeline, looking southeast towards where the Canadian Northern Railway line crosses Rue St. Joseph. Photograph taken from a concrete tower near the Taché surge tower by an unknown photographer.
Sans titre
Driving piles into Seine River for aqueduct
Fait partie de Greater Winnipeg Water District fonds
Photograph of piles being driven into the Seine River for the Winnipeg Aqueduct, north of Provencher Boulevard. Photographer is unknown.
Sans titre
Front wall of aqueduct's intake at Indian Bay
Fait partie de Greater Winnipeg Water District fonds
Photograph of the front wall, skimming, and channel of the Winnipeg Aqueduct's intake at Indian Bay, looking west. Photographer is unknown.
Sans titre
Walls of Taché surge tower from above
Fait partie de Greater Winnipeg Water District fonds
Photograph of the walls of the Taché surge tower, still under construction, taken from a concreting tower. Photographer is unknown.
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Photograph of the Seine River crossing of the Winnipeg Aqueduct, taken from the Canadian Northern Railway tracks north of Provencher Boulevard and looking northeast towards Rue Notre Dame. Photographer is unknown.
Sans titre
Last train to cofferdam at aqueduct intake at Indian Bay
Fait partie de Greater Winnipeg Water District fonds
Photograph of the last train to go to the cofferdam at the Winnipeg Aqueduct's intake at Indian Bay, taken from the rock cut. Photographer is unknown.
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Photographs from the construction of Branch 1 of the Greater Winnipeg Water District aqueduct.
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Sans titre
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Sans titre
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of 48 inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking west toward McPhillips St (note bridge across trench) approximately from pressure manhole at Sta. 77+47. Work progressed eastward from Alexander Avenue
Sans titre