City pipe line – rain water running through ditch
Digging out pipe raised by rain near well number 3
Valve – 36” pipe line
Floods from rain storm – City pipe line
Digging out pipe raised by rain
Laying 36” pipe under CPR subway
Bend at well number 1 – 36” City pipe line
City pipeline raised by rain
City pipeline raised by rain near well number 3
Excavating for City pipe line
Placing valve for 36” City pipe line at well number 1
36” pipe – City pipe line
Excavating well number 8 for 36” City pipe line
City pipeline at well number 8
Alderman Midwinter and trenching machine at City well number 8
Lowering 36” City pipe line into trench
View of City pipe line with 36” pipe
Connecting pipe – City pipe line
View of City pipe line
View of City pipe line and company’s camp