Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Contract 65 - Mile 1.5 - View of 48 inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking east toward Xante Street approximately from location of pressure manhole at Sta. 77+47. Work progressed eastward from Alexander Avenue at Yeomans Stree
Contract 65 - Mile 1.5 - View of 48 inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking west toward McPhillips St (note bridge across trench) approximately from pressure manhole at Sta. 77+47. Work progressed eastward from Alexander Avenue
Forms part of Fonds 15. Series consists of photographs taken by GWWD employees during the building of the Greater Winnipeg Aqueduct that brings water from Shoal Lake to Winnipeg. Photos are made up of nitrate negatives and lantern slides.
Forms part of Fonds 15. Series consists of financial ledgers and journals, pay sheets, financial statements, annual reports, and other financial material. Many of the ledgers and journals are oversized.
Forms part of Fonds 15. Series consists of communications and reports created or received by the Greater Winnipeg Water District. Included are copies of a 1912 report by Charles Slichter and Rudolph Hering’s Report on a Water Supply from Shoal Lake for the Greater Winnipeg Water District, 1913. Also included are various maps and plans for the aqueduct, aqueduct operating and intake records, correspondence regarding land right of ways and correspondence regarding the rail line constructed by the GWWD.
Typed index for the minutes of the Board of Administration of the Greater Winnipeg Water District, 1913-1916. The index is arranged alphabetically by subject, each specifying a number that corresponds with numbers in the left margin of the minutes.
Typed minutes of the Board of Administration of the Greater Winnipeg Water District for 20 Oct. 1916. Consists of minute numbers 1804-1815, visible in the left margin. These numbers correspond to numbers in the index.
Typed minutes of the Board of Administration of the Greater Winnipeg Water District for 6 Oct. 1916. Consist of minute numbers 1789-1803, visible in the left margin. These numbers correspond to numbers in the index.
Typed minutes and related correspondences of the Board of Administration of the Greater Winnipeg Water District for 27 Sep. 1916. Consists of minute numbers 1787-1788, visible in the left margin. These numbers correspond to numbers in the index.
Typed minutes of the Board of Administration of the Greater Winnipeg Water District for 22 Sep. 1916. Consists of minute numbers 1773-1786, visible in the left margin. These numbers correspond to numbers in the index.