Pouring piers for Taché surge tower
- i01229
- Item
- 1918
Photograph of workers pouring piers for the Taché surge tower. Photographer is unknown.
Greater Winnipeg Water District
64 results with digital objects Show results with digital objects
Pouring piers for Taché surge tower
Photograph of workers pouring piers for the Taché surge tower. Photographer is unknown.
Greater Winnipeg Water District
Pumping water from trench near Spruce Siding
Photograph of water being pumped from a trench next to the Greater Winnipeg Water District Railway near Spruce Siding, Manitoba, looking southeast. Photographer is unknown.
Greater Winnipeg Water District
Riprapping west side of Falcon River Diversion Dyke at Indian Bay
Photograph of workers riprapping the west side of the Falcon River Diversion Dyke at Indian Bay. Photographer is unknown.
Greater Winnipeg Water District
Photograph of the Seine River where the Winnipeg Aqueduct crosses, looking northeast towards the Canadian Northern Railway main line and Rue Notre Dame (at right). Photographer is unknown.
Greater Winnipeg Water District
Photograph of the Seine River where the Winnipeg Aqueduct crosses, looking northeast towards the Canadian Northern Railway main line and Rue Notre Dame (at right). Photographer is unknown.
Greater Winnipeg Water District
Photograph of the Seine River crossing of the Winnipeg Aqueduct, taken from the Canadian Northern Railway tracks north of Provencher Boulevard and looking northeast towards Rue Notre Dame. Photographer is unknown.
Greater Winnipeg Water District
Seine River south of aqueduct crossing
Photograph of the Seine River just south of the Winnipeg Aqueduct's crossing, looking southeast towards Provencher Boulevard and the Tissot area. The St. Boniface water tower can be seen behind the buildings in the background. Photographer is unknown.
Greater Winnipeg Water District
Soil test for aqueduct near Brokenhead River
Photograph of a soil test for the Winnipeg Aqueduct near Brokenhead River, east of Ross, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Test Sections of aqueduct at Exhibition Grounds
Photograph of a test section of the Winnipeg Aqueduct at the Winnipeg Exhibition Grounds. Photograph faces west towards McPhillips Street and was taken by an unknown photographer.
Greater Winnipeg Water District
Three sections of aqueduct arch as viewed from invert
Photograph of three sections of Winnipeg Aqueduct arches east of Brokenhead River, as viewed from an invert. Photographer is unknown.
Greater Winnipeg Water District
Treaty Grounds - Kekekoziibii Shoal Lake 40 First Nation
Photograph of Kekekoziibii (Shoal Lake 40) First Nation camp at Shoal Lake. Photograph taken from the Falcon River Diversion Dyke by William G. Chace, Chief Engineer of the Winnipeg Aqueduct.
Greater Winnipeg Water District
Tunnel shaft of Red River Crossing
Tunnel shaft of Red River Crossing.
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District