Looking east over Red River trestle bridge
Pouring piers for Taché surge tower
Seine River south of aqueduct crossing
Seine River aqueduct crossing
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of men mucking out trench for 48-inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue
Passengers aboard GWWD Railway Service car at St. Boniface Station
Man sitting inside City pipeline
Water tower and walls at Union Stock Yards
Valve – 36” pipe line
36” pipe line bend at City well number 1
Trench machine at City well number 8
Excavating for City pipe line
Placing valve for 36” City pipe line at well number 1
36” pipe – City pipe line
Excavating well number 8 for 36” City pipe line
City pipe line raised by rains
Bend at well number 1 – 36” City pipe line
Number 33 - Compressor at high pressure plant
Winnipeg's 75th Anniversary parade - City Hydro float