Lowering 36” City pipe line into trench
View of City pipe line with 36” pipe
Connecting pipe – City pipe line
View of City pipe line
View of City pipe line and company’s camp
City pipeline raised by rain
City pipeline raised by rain near well number 3
Excavating frozen earth at City pipe line
Lowering pipe into trench – City 36” pipe line
Digging trench for 36” City pipe line
City pipe line – rain water running through ditch
36” City pipe line – valve at turn near well number 1
Sump pump ditch at Port Arthur (Thunder Bay), looking west from pump
Flooded trench – likely for City pipe line
Trench machine and camps – City 36” pipe line
Timbering septic tank for Ninette Sanatorium
Floods from rain storm – City pipe line
Digging out pipe raised by rain
Laying 36” pipe under CPR subway
Bend at well number 1 – 36” City pipe line