Front wall of aqueduct's intake at Indian Bay
- i01226
- Item
- 1918
Photograph of the front wall, skimming, and channel of the Winnipeg Aqueduct's intake at Indian Bay, looking west. Photographer is unknown.
Greater Winnipeg Water District
Front wall of aqueduct's intake at Indian Bay
Photograph of the front wall, skimming, and channel of the Winnipeg Aqueduct's intake at Indian Bay, looking west. Photographer is unknown.
Greater Winnipeg Water District
Walls of Taché surge tower from above
Photograph of the walls of the Taché surge tower, still under construction, taken from a concreting tower. Photographer is unknown.
Greater Winnipeg Water District
Photograph of the Seine River crossing of the Winnipeg Aqueduct, taken from the Canadian Northern Railway tracks north of Provencher Boulevard and looking northeast towards Rue Notre Dame. Photographer is unknown.
Greater Winnipeg Water District
Photograph of an apparatus for testing the permeability of the Winnipeg Aqueduct. Concrete samples can be seen on the bottom left. Photographer is unknown.
Greater Winnipeg Water District
Last train to cofferdam at aqueduct intake at Indian Bay
Photograph of the last train to go to the cofferdam at the Winnipeg Aqueduct's intake at Indian Bay, taken from the rock cut. Photographer is unknown.
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Tunnel shaft of Red River Crossing
Tunnel shaft of Red River Crossing.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District
Part of City of Winnipeg (1874-1971)
Detached from page 152 of Water Works Scrapbook. A photograph of City employee D. W. (Bud) Steuart. Likely worked for the Water Works Department at one point. This black and white photograph shows Steuart posing in a residential area at winter time. Inscription (on recto): "Bud". Caption: "D. W. Steuart, Entered Service 28 May 1911, Left Service June 5, 191[7], On Active Service for King & Country." Date of photograph is approximate, [ca. 1917].
Pouring aqueduct pipes at plant in Transcona
Photograph of two pipes for the Winnipeg Aqueduct being poured at Canada Lock Joint Pipe Ltd. in Transcona. Photograph taken by T.H. Kirby.
Greater Winnipeg Water District
Leveling and floating aqueduct inverts between McMunn and East Braintree
Photograph of workers leveling and floating Winnipeg Aqueduct inverts between McMunn, Manitoba, and East Braintree, Manitoba.
Greater Winnipeg Water District
Aqueduct drag line between East Braintree and Shoal Lake
Photograph of a dragline working on the Winnipeg Aqueduct between East Braintree, Manitoba, and Shoal Lake. Photographer is unknown.
Greater Winnipeg Water District