Driving piles into Seine River for aqueduct
- i01238
- Item
- [1918?]
Photograph of piles being driven into the Seine River for the Winnipeg Aqueduct, north of Provencher Boulevard. Photographer is unknown.
Greater Winnipeg Water District
Driving piles into Seine River for aqueduct
Photograph of piles being driven into the Seine River for the Winnipeg Aqueduct, north of Provencher Boulevard. Photographer is unknown.
Greater Winnipeg Water District
Dredge excavating for aqueduct near Meadowvale
Photograph of a dredge excavating for the Winnipeg Aqueduct near Meadowvale, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Dredge excavating for aqueduct south of Anola
Photograph of a dredge excavating for the Winnipeg Aqueduct south of Anola, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
Treaty Grounds - Kekekoziibii Shoal Lake 40 First Nation
Photograph of Kekekoziibii (Shoal Lake 40) First Nation camp at Shoal Lake. Photograph taken from the Falcon River Diversion Dyke by William G. Chace, Chief Engineer of the Winnipeg Aqueduct.
Greater Winnipeg Water District
Excavating Falcon River Diversion Canal at Shoal Lake
Photograph of a dredge excavating the Falcon River Diversion Canal between Indian Bay and Snowshoe Bay, with consulting Engineer James H. Fuertes standing to the right. Photograph is looking northwest and the photographer is unknown.
Greater Winnipeg Water District
Photograph of the west end of a reinforced section of the Winnipeg Aqueduct siphon at Brokenhead River. Photographer is unknown.
Greater Winnipeg Water District
Chief Engineer Chace in aqueduct arch
Photograph of William G. Chace, Chief Engineer of the Winnipeg Aqueduct, standing in front of a completed aqueduct arch east of Brokenhead River. Photographer is unknown.
Greater Winnipeg Water District
Soil test for aqueduct near Brokenhead River
Photograph of a soil test for the Winnipeg Aqueduct near Brokenhead River, east of Ross, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Concrete section of aqueduct near Spruce Siding
Photograph of a concrete section of the Winnipeg Aqueduct near Spruce Siding, Manitoba. The aqueduct section is packed with backfill and ready for more to be placed by machine. Photographer is unknown.
Greater Winnipeg Water District
Dredge excavating for aqueduct east of Deacon
Photograph of a dredge excavating for the Winnipeg Aqueduct east of Deacon. Photographer is unknown.
Greater Winnipeg Water District
Mixer site next to GWWD rail siding east of East Braintree
Photograph of a mixer site opposite Greater Winnipeg Water District siding rail line number 8, east of East Braintree, Manitoba. Photographer is unknown.
Greater Winnipeg Water District
Front wall of aqueduct's intake at Indian Bay
Photograph of the front wall, skimming, and channel of the Winnipeg Aqueduct's intake at Indian Bay, looking west. Photographer is unknown.
Greater Winnipeg Water District
Walls of Taché surge tower from above
Photograph of the walls of the Taché surge tower, still under construction, taken from a concreting tower. Photographer is unknown.
Greater Winnipeg Water District
Photograph of the Seine River crossing of the Winnipeg Aqueduct, taken from the Canadian Northern Railway tracks north of Provencher Boulevard and looking northeast towards Rue Notre Dame. Photographer is unknown.
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District