Showing 48 results

archival descriptions
Morris Block collection Public utilities
Print preview Hierarchy View:

48 results with digital objects Show results with digital objects

Valve ready to be placed – 36” City pipe line
Valve ready to be placed – 36” City pipe line
Flooded trench – likely for City pipe line
Flooded trench – likely for City pipe line
Flooded trench – 36” City pipe line
Flooded trench – 36” City pipe line
Train cars at Union Stock Yards
Train cars at Union Stock Yards
Work being done near water tower at Union Stock Yards
Work being done near water tower at Union Stock Yards
Trench machine and camps – City 36” pipe line
Trench machine and camps – City 36” pipe line
Floods from rain storm – City pipe line
Floods from rain storm – City pipe line
Digging out pipe raised by rain
Digging out pipe raised by rain
Laying 36” pipe under CPR subway
Laying 36” pipe under CPR subway
Bend at well number 1 – 36” City pipe line
Bend at well number 1 – 36” City pipe line
Digging trench for 36” City pipe line
Digging trench for 36” City pipe line
Lowering 36” City pipe line under CPR subway crossing
Lowering 36” City pipe line under CPR subway crossing
Trench for City pipeline
Trench for City pipeline
Buildings and water tower of Union Stock Yards
Buildings and water tower of Union Stock Yards
Alderman Midwinter and trenching machine at City well number 8
Alderman Midwinter and trenching machine at City well number 8
Lowering 36” City pipe line into trench
Lowering 36” City pipe line into trench
View of City pipe line with 36” pipe
View of City pipe line with 36” pipe
Connecting pipe – City pipe line
Connecting pipe – City pipe line
View of City pipe line
View of City pipe line
View of City pipe line and company’s camp
View of City pipe line and company’s camp
Results 21 to 40 of 48