Affichage de 56 résultats

description archivistique
Pièce Machinery Anglais
Aperçu avant impression Hierarchy Affichage :

54 résultats avec objets numériques Afficher les résultats avec des objets numériques

View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street

Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing

Sans titre

Landscaping of lake in St. Vital Park

Photograph of sunken lawn in St. Vital Park being prepared to become a filled lake. The lake was excavated in 1931, but was not filled until 1966. A description of the photo used for publication is recorded on a separate piece of paper. Photo's reverse is stamped by the Parks and Protection Division of the Metro Government.

Sans titre

Backfilling section of aqueduct between Prawda and McMunn

Photograph of engineers standing next to a completed section of the Winnipeg Aqueduct being backfilled by a dragline, somewhere between Prawda, Manitoba, and McMunn, Manitoba. From left to right: Engineer of Design Maxwell V. Sauer (at aqueduct), Division Engineers George F. Richan and C.J. Bruce, and unknown. Photographer is unknown.

Sans titre

Résultats 1 à 20 sur 56