Showing 60 results

archival descriptions
Greater Winnipeg Water District With digital objects
Print preview View:
Contract 65 - Mile 1.5 - View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 3.2 - View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street
Contract 65 - Mile 3.2 - View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street
Contract 65 - Mile 3.2 - View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Falcon River Diversion Dyke - Treaty Grounds - First Nations Reserve [Shoal Lake No. 40]
Falcon River Diversion Dyke - Treaty Grounds - First Nations Reserve [Shoal Lake No. 40]
Excavating Channel - Indian Bay to Snowshoe Bay [Contract 36 - Falcon River Diversion Canal]
Excavating Channel - Indian Bay to Snowshoe Bay [Contract 36 - Falcon River Diversion Canal]
Contract 31 - Mile 43 - Three sections of arch as viewed from invert
Contract 31 - Mile 43 - Three sections of arch as viewed from invert
Contract 34 - Mile 89 Putting in Box Drains
Contract 34 - Mile 89 Putting in Box Drains
Mile 97.5 - Party at Indian Bay
Mile 97.5 - Party at Indian Bay
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Division 3A - Camp 6 - Class #14 Drag Line
Division 3A - Camp 6 - Class #14 Drag Line
Results 1 to 10 of 60