Showing 399 results

archival descriptions
Public utilities
Print preview Hierarchy View:

379 results with digital objects Show results with digital objects

Lowering 36” City pipe line into trench
Lowering 36” City pipe line into trench
Excavating for City pipe line
Excavating for City pipe line
Alderman Midwinter and trenching machine at City well number 8
Alderman Midwinter and trenching machine at City well number 8
Trench machine at City well number 8
Trench machine at City well number 8
Trench machine and camps – City 36” pipe line
Trench machine and camps – City 36” pipe line
Excavation at Emily and Bannatyne
Excavation at Emily and Bannatyne
Excavating frozen earth for City pipe line
Excavating frozen earth for City pipe line
36” pipe line bend at City well number 1
36” pipe line bend at City well number 1
Valve – 36” pipe line
Valve – 36” pipe line
Work being done near water tower at Union Stock Yards
Work being done near water tower at Union Stock Yards
Water tower and walls at Union Stock Yards
Water tower and walls at Union Stock Yards
Train cars at Union Stock Yards
Train cars at Union Stock Yards
Buildings and water tower of Union Stock Yards
Buildings and water tower of Union Stock Yards
Trench for City pipeline
Trench for City pipeline
Man sitting inside City pipeline
Man sitting inside City pipeline
Winnipeg's 75th Anniversary parade - City Hydro float
Winnipeg's 75th Anniversary parade - City Hydro float
Number 33 - Compressor at high pressure plant
Number 33 - Compressor at high pressure plant
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, General Progress
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, General Progress
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, No. 2 Mixer
City of Winnipeg - 18,000,000 Imperial Gallon Reservoir, No. 2 Mixer
Bathing beach at Waugh
Bathing beach at Waugh
Results 181 to 200 of 399