Showing 111 results

archival descriptions
Item Labour
Print preview Hierarchy View:

110 results with digital objects Show results with digital objects

Man holding pipe
Man holding pipe
McPhillips Street, 24 inch concrete pipe, laid 1938
McPhillips Street, 24 inch concrete pipe, laid 1938
No. 6 Renewal of 8 inch cast iron water pipe in Portage Avenue from Kennedy Street to Main Street...
No. 6 Renewal of 8 inch cast iron water pipe in Portage Avenue from Kennedy Street to Main Street with 10 inch transit pipe, laid June, 1938
Screeds, new concrete road, Inkster, east of McKenzie
Screeds, new concrete road, Inkster, east of McKenzie
Screed - Inkster Boulevard, east of McKenzie Street
Screed - Inkster Boulevard, east of McKenzie Street
Placing steel in Digestor slab
Placing steel in Digestor slab
Surge tank, excavating
Surge tank, excavating
West Clarifier, floor
West Clarifier, floor
West Clarifier, pile foundation - clay core
West Clarifier, pile foundation - clay core
West Clarifier, 1st section wall
West Clarifier, 1st section wall
Outfall sewer, Armco iron pipe, 1936
Outfall sewer, Armco iron pipe, 1936
Outfall sewer, reinforcing diffuser, 1936
Outfall sewer, reinforcing diffuser, 1936
Montcalm Street, river crossing
Montcalm Street, river crossing
Montcalm Street, river crossing
Montcalm Street, river crossing
Junction, main interceptor and surge tank
Junction, main interceptor and surge tank
Montcalm Street, river crossing
Montcalm Street, river crossing
Driving piles into Seine River for aqueduct
Driving piles into Seine River for aqueduct
Walls of Taché surge tower from above
Walls of Taché surge tower from above
Pouring piers for Taché surge tower
Pouring piers for Taché surge tower
Excavated and timbered Taché surge tower
Excavated and timbered Taché surge tower
Results 61 to 80 of 111