Showing 60 results

archival descriptions
Greater Winnipeg Water District fonds With digital objects
Print preview View:
Contract - 32 - Mile 57 - Form Section 3 and 5
Contract - 32 - Mile 57 - Form Section 3 and 5
Contract 15 - Falcon River Diversion Dyke - Method of placing material from cars into dump by use of scow
Contract 15 - Falcon River Diversion Dyke - Method of placing material from cars into dump by use of scow
Contract 15 - Falcon River Diversion Dyke - Riprapping west side of dyke
Contract 15 - Falcon River Diversion Dyke - Riprapping west side of dyke
Contract 15 - Mile 97.5 - Falcon River Diversion Dyke
Contract 15 - Mile 97.5 - Falcon River Diversion Dyke
Contract 30 - Mile 21.47 Drainage siphon (culvert) under aqueduct
Contract 30 - Mile 21.47 Drainage siphon (culvert) under aqueduct
Contract 30 - Mile 23 - Backfilling over aqueduct with dragline
Contract 30 - Mile 23 - Backfilling over aqueduct with dragline
Contract 31 - Mile 43 - Chief Engineer in Arch.
Contract 31 - Mile 43 - Chief Engineer in Arch.
Contract 31 - Mile 43 - Three sections of arch as viewed from invert
Contract 31 - Mile 43 - Three sections of arch as viewed from invert
Contract 31 - West End of Reinforced Siphon, Broken Head River
Contract 31 - West End of Reinforced Siphon, Broken Head River
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Results 1 to 10 of 60