Backfilling over aqueduct with dragline
Brokenhead River siphon
Bucyrus Class 7 dragline backfilling completed aqueduct
Camp 9, mixer site opposite siding 8
Concrete plant - Transcona, simultaneous pouring of two pipes
Division 3A - Camp 6 - Class #14 Drag Line
Driving Piles at Seine River Crossing of 66" Pipe Line
Excavating Channel - Indian Bay to Snowshoe Bay
General View of Well Walls from Above
Intake - View of unwatered cofferdam
Intake - entrance showing channel, skimming, and front wall
Photographs
Photographs
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street
Walking dredge, Camp 1