Camp 9, mixer site opposite siding 8
- i01219
- Item
- 1917
Contract 33 - Mile 82 - Camp 9 - Mixer site opposite Siding 8, Glenn.
Greater Winnipeg Water District
68 results with digital objects Show results with digital objects
Camp 9, mixer site opposite siding 8
Contract 33 - Mile 82 - Camp 9 - Mixer site opposite Siding 8, Glenn.
Greater Winnipeg Water District
Chief Engineer W.G. Chase in arch
Contract 31 - Mile 43 - Chief Engineer W.G. Chace at completed arch.
Greater Winnipeg Water District
Contractor's Device for Moving Outside Forms
Contract 32 - Mile 57 - Contractor's device for moving outside arch forms.
Greater Winnipeg Water District
Contract 15 - Falcon River Diversion Dyke - Method of placing material from cars into dump by use of scow. Photo by W.G. Chace.
Greater Winnipeg Water District
Forms for arch of sections 3 and 5
Contract 32 - Mile 57 - Forms for arch sections 3 and 5. Photo by W.G. Chace.
Greater Winnipeg Water District
Handmucking between the pole piling
Contract 34 - Mile 92.5 - Camp 7 - Slide at Sta. 4886. Hand mucking between the pole piling. (see image 900)
Greater Winnipeg Water District
Intake - filling last gap in cofferdam between the dykes
Contract 35 - Mile 97.5 - Intake - Filling last gap in cofferdam between the dykes. Viewed from west dyke.
Greater Winnipeg Water District
Forms part of Fonds 15. Series consists of photographs taken by GWWD employees during the building of the Greater Winnipeg Aqueduct that brings water from Shoal Lake to Winnipeg. Photos are made up of nitrate negatives and lantern slides.
Greater Winnipeg Water District
Pumping water from trench, looking southeast
Contract 32 - Mile 58 - Pumping water from trench, looking southeast.
Greater Winnipeg Water District
Contract 55 - Mile 4.4 - Seine River crossing, looking northeast from CNR toward Rue Notre Dame.
Greater Winnipeg Water District