Camp 9, mixer site opposite siding 8
Chief Engineer W.G. Chase in arch
Contractor's Device for Moving Outside Forms
Falcon River Diversion Dyke
Forms for arch of sections 3 and 5
Handmucking between the pole piling
Intake - filling last gap in cofferdam between the dykes
Passengers aboard GWWD Railway Service car at St. Boniface Station
Pumping water from trench, looking southeast
Seine River Crossing
Syphon [or Siphon] at Birch River Crossing