Showing 56 results

archival descriptions
City of Winnipeg Archives Photograph collection Labour
Print preview Hierarchy View:

55 results with digital objects Show results with digital objects

Montcalm Street, river crossing
Montcalm Street, river crossing
Montcalm Street, river crossing
Montcalm Street, river crossing
Junction, main interceptor and surge tank
Junction, main interceptor and surge tank
Montcalm Street, river crossing
Montcalm Street, river crossing
West Clarifier, 1st section wall
West Clarifier, 1st section wall
West Clarifier, floor
West Clarifier, floor
Outfall sewer, Armco iron pipe, 1936
Outfall sewer, Armco iron pipe, 1936
Placing steel in Digestor slab
Placing steel in Digestor slab
Outfall sewer, reinforcing diffuser, 1936
Outfall sewer, reinforcing diffuser, 1936
West Clarifier, pile foundation - clay core
West Clarifier, pile foundation - clay core
Surge tank, excavating
Surge tank, excavating
Screed - Inkster Boulevard, east of McKenzie Street
Screed - Inkster Boulevard, east of McKenzie Street
Screeds, new concrete road, Inkster, east of McKenzie
Screeds, new concrete road, Inkster, east of McKenzie
No. 6 Renewal of 8 inch cast iron water pipe in Portage Avenue from Kennedy Street to Main Street...
No. 6 Renewal of 8 inch cast iron water pipe in Portage Avenue from Kennedy Street to Main Street with 10 inch transit pipe, laid June, 1938
Man holding pipe
Man holding pipe
Two men aligning pipe
Two men aligning pipe
McPhillips Street, 24 inch concrete pipe, laid 1938
McPhillips Street, 24 inch concrete pipe, laid 1938
Men loading concrete forms onto truck
Men loading concrete forms onto truck
Men and concrete form in trench under wooden support
Men and concrete form in trench under wooden support
Men and crane lifting concrete form
Men and crane lifting concrete form
Results 1 to 20 of 56