Exhibit E in the matter of posting Metropolitan Corporation of Greater Winnipeg By-law 1505
Contractor's Device for Moving Outside Forms
Forms for arch of sections 3 and 5
Drainage siphon (culvert) under aqueduct
Rip-rapping west side of Falcon River Diversion dyke
Bucyrus Class 7 dragline backfilling completed aqueduct
Backfilling over aqueduct with dragline
Putting in Box Drains
Soil Test Section "E"
Bending steel for inverts, Camp 3
Division 3A - Camp 6 - Class #14 Drag Line
Screeding and floating inverts at Camp 4
Handmucking between the pole piling
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of men mucking out trench for 48-inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street
View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street