- i01229
- Item
- 1918
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
209 results with digital objects Show results with digital objects
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 34 - Mile 89 - Putting in box drains.
Greater Winnipeg Water District
Bending steel for inverts, Camp 3
Contract 30 - Mile 25 - Camp 3 - Bending invert steel reinforcing bars to template. Division 30 Engineer C.J. Bruce at center (hands on hips).
Greater Winnipeg Water District
Concrete plant - Transcona, simultaneous pouring of two pipes
Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Simultaneous pouring of two pipes. Photo by T.H. Kirby.
Greater Winnipeg Water District
Screeding and floating inverts at Camp 4
Contract 33 - Mile 75 - Camp 4 - Screeding and floating inverts.
Greater Winnipeg Water District
Intake - View of unwatered cofferdam
Contract 35 - Mile 97.5 - Intake - View of unwatered cofferdam from Sta. 5152 in coffer.
Greater Winnipeg Water District
Handmucking between the pole piling
Contract 34 - Mile 92.5 - Camp 7 - Slide at Sta. 4886. Hand mucking between the pole piling. (see image 900)
Greater Winnipeg Water District
Contractor's Device for Moving Outside Forms
Contract 32 - Mile 57 - Contractor's device for moving outside arch forms.
Greater Winnipeg Water District