Driving Piles at Seine River Crossing of 66" Pipe Line
- i01238
- Item
- [1918?]
Contract 55 - Mile 4.4 - Driving piles at Seine River crossing of 66 inch pipeline. Note pipes.
Greater Winnipeg Water District
4 results with digital objects Show results with digital objects
Driving Piles at Seine River Crossing of 66" Pipe Line
Contract 55 - Mile 4.4 - Driving piles at Seine River crossing of 66 inch pipeline. Note pipes.
Greater Winnipeg Water District
General View of Well Walls from Above
Contract 56 - Mile 3.5 - Red River Crossing - General view from concreting tower of walls of well structure (Taché surge tower).
Greater Winnipeg Water District
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
Well excavation timbered to floor
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.