Backfilling over aqueduct with dragline
Bending steel for inverts, Camp 3
Bucyrus Class 7 dragline backfilling completed aqueduct
Camp 9, mixer site opposite siding 8
Concrete plant - Transcona, simultaneous pouring of two pipes
Contractor's Device for Moving Outside Forms
Division 3A - Camp 6 - Class #14 Drag Line
Drainage siphon (culvert) under aqueduct
Driving Piles at Seine River Crossing of 66" Pipe Line
Excavating Channel - Indian Bay to Snowshoe Bay
Falcon River Diversion Dyke
Forms for arch of sections 3 and 5
General View of Well Walls from Above
Handmucking between the pole piling
Intake - View of unwatered cofferdam
Pouring piers
Putting in Box Drains
Rip-rapping west side of Falcon River Diversion dyke
Screeding and floating inverts at Camp 4
Soil Test Section "E"