Camp 9, mixer site opposite siding 8
Chief Engineer W.G. Chase in arch
Contractor's Device for Moving Outside Forms
Falcon River Diversion Dyke
Forms for arch of sections 3 and 5
Handmucking between the pole piling
Intake - filling last gap in cofferdam between the dykes
Passengers aboard GWWD Railway Service car at St. Boniface Station
Pumping water from trench, looking southeast
Seine River Crossing
Side view of 20 cubic yard air dump car
Syphon [or Siphon] at Birch River Crossing