Well excavation timbered to floor
- i01228
- Item
- 1918
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District
31 results with digital objects Show results with digital objects
Well excavation timbered to floor
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Contract 31 - Mile 40 - Soil test, Section "E". 6"x6", load 1000 pounds.
Greater Winnipeg Water District
Screeding and floating inverts at Camp 4
Contract 33 - Mile 75 - Camp 4 - Screeding and floating inverts.
Greater Winnipeg Water District
Rip-rapping west side of Falcon River Diversion dyke
Contract 15 - Falcon River Diversion Dyke – Rip-rapping west side of dyke.
Greater Winnipeg Water District
Contract 34 - Mile 89 - Putting in box drains.
Greater Winnipeg Water District
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
Forms part of Fonds 15. Series consists of photographs taken by GWWD employees during the building of the Greater Winnipeg Aqueduct that brings water from Shoal Lake to Winnipeg. Photos are made up of nitrate negatives and lantern slides.
Greater Winnipeg Water District
Intake - View of unwatered cofferdam
Contract 35 - Mile 97.5 - Intake - View of unwatered cofferdam from Sta. 5152 in coffer.
Greater Winnipeg Water District
Handmucking between the pole piling
Contract 34 - Mile 92.5 - Camp 7 - Slide at Sta. 4886. Hand mucking between the pole piling. (see image 900)
Greater Winnipeg Water District
General View of Well Walls from Above
Contract 56 - Mile 3.5 - Red River Crossing - General view from concreting tower of walls of well structure (Taché surge tower).