Proclamation - Secretaries Week
Proclamation - Secretaries Week
Exhibit E in the matter of posting Metropolitan Corporation of Greater Winnipeg By-law 1505
Contractor's Device for Moving Outside Forms
Forms for arch of sections 3 and 5
Drainage siphon (culvert) under aqueduct
Rip-rapping west side of Falcon River Diversion dyke
Bucyrus Class 7 dragline backfilling completed aqueduct
Backfilling over aqueduct with dragline
Putting in Box Drains
Soil Test Section "E"
Bending steel for inverts, Camp 3
Division 3A - Camp 6 - Class #14 Drag Line
Screeding and floating inverts at Camp 4
Handmucking between the pole piling
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of men mucking out trench for 48-inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street