Winnipeg in Focus is a database for archival descriptions and digital collections at the City of Winnipeg Archives.

Showing 68 results

archival descriptions
Greater Winnipeg Water District
Print preview View:

61 results with digital objects Show results with digital objects

Branch 1

Branch 1
Greater Winnipeg Water District
Greater Winnipeg Water District

Contract 65 - Mile 1.5 - View of 48-inch Branch 1 aqueduct in shored trench o...

Contract 65 - Mile 1.5 - View of 48-inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking west toward McPhillips Street

Contract 65 - Mile 1.5 - View of 48-inch Branch 1 aqueduct in shored trench o...

Contract 65 - Mile 1.5 - View of 48-inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of men mucking out trench for 48-inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue
Contract 65 - Mile 1.5 - View of men mucking out trench for 48-inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street
Results 1 to 10 of 68