Print preview Close

Showing 189 results

archival descriptions
Labour
Print preview Hierarchy View:

185 results with digital objects Show results with digital objects

William Smaill Photo Album – Page 91

Captions read: Shows settlement of class 19[?] in muskeg, mile 86 - Foundation Fill, camp 6 - Pilot ditch dug with class in drag, shows how muskeg rises in ditch after being excavated to a depth of 8 feet.

Smaill, William

William Smaill Photo Album – Page 97

Captions read: Views at Camp 2, Mile 51 - Packed backfill, gravel - Inverst after Rainstorm - Boulders from trench - Mixer, concrete cars, and gas dinkey - Pads protected from frost with moss - Manhole and blowoff - Mixer.

Smaill, William

William Smaill Photo Album – Page 108

Captions read: My car at mile 38 - Indian Bay - First crew to operate class 7 drag, C. Walgren, operator, [W.H.?] Smaill, fireman - Lassie, Hamish - Fisherman's Tug, Shoal Lake. Also contains a photo showing Kekekoziibii Shoal Lake 40 First Nation in the distance.

Smaill, William

Backfilling section of aqueduct between Prawda and McMunn

Photograph of engineers standing next to a completed section of the Winnipeg Aqueduct being backfilled by a dragline, somewhere between Prawda, Manitoba, and McMunn, Manitoba. From left to right: Engineer of Design Maxwell V. Sauer (at aqueduct), Division Engineers George F. Richan and C.J. Bruce, and unknown. Photographer is unknown.

Greater Winnipeg Water District

Results 141 to 160 of 189