Well excavation timbered to floor
- i01228
- Item
- 1918
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District
175 results with digital objects Show results with digital objects
Well excavation timbered to floor
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District
Contract 30 - Mile 16 - Camp 1 - Walking dredge excavating.
Greater Winnipeg Water District
View of route of 66" diameter reinforced concrete pipe line from concrete tower
Contract 55 - Mile 3.6 - View of route of 66 inch diameter reinforced concrete pipeline (on Rue Arnaud, Rue St. Joseph and Rue Aubert) from concreting tower of Contract 56. Canadian National Railway main line cuts through upper half of image, and Seine R
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of 48 inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking west toward McPhillips St (note bridge across trench) approximately from pressure manhole at Sta. 77+47. Work progressed eastward from Alexander Avenue
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of 48 inch Branch 1 aqueduct in shored trench on Pacific Avenue, looking east toward Xante Street approximately from location of pressure manhole at Sta. 77+47. Work progressed eastward from Alexander Avenue at Yeomans Stree
Greater Winnipeg Water District
Tunnel shaft of Red River Crossing
Tunnel shaft of Red River Crossing.
Greater Winnipeg Water District
Treaty Grounds - Kekekoziibii Shoal Lake 40 First Nation
Falcon River Diversion Dyke - Treaty Grounds - Indian Reserve [Kekekoziibii Shoal Lake 40 First Nation]. Photo by W.G. Chace.
Greater Winnipeg Water District
Three sections of arch as viewed from invert
Contract 31 - Mile 43 - Three sections of arch as viewed from invert.
Greater Winnipeg Water District
Test on a P.S. pipe, Transcona
Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Hydrostatic pressure test on "P.S." section pipe - 40 pounds pressure. Same pipe section as in image 718. P.S. section pipe was designed for railway crossings and the Seine River crossing.
Greater Winnipeg Water District
Test on a P.S. pipe, Transcona
Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Hydrostatic pressure test on a "P.S." section pipe - 40 pounds pressure. Same pipe section as in image 709. P.S. section pipe was designed for railway crossings and the Seine River crossing.
Greater Winnipeg Water District