Winnipeg in Focus is a database for archival descriptions and digital collections at the City of Winnipeg Archives.
Print preview Close

Showing 183 results

archival descriptions
City of Winnipeg Archives Greater Winnipeg Water District Item
Print preview Hierarchy View:

175 results with digital objects Show results with digital objects

Test on a P.S. pipe, Transcona

Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Hydrostatic pressure test on "P.S." section pipe - 40 pounds pressure. Same pipe section as in image 718. P.S. section pipe was designed for railway crossings and the Seine River crossing.

Greater Winnipeg Water District

Test on a P.S. pipe, Transcona

Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Hydrostatic pressure test on a "P.S." section pipe - 40 pounds pressure. Same pipe section as in image 709. P.S. section pipe was designed for railway crossings and the Seine River crossing.

Greater Winnipeg Water District

View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street

Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing

Greater Winnipeg Water District

View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street

Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C

Greater Winnipeg Water District

View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street

Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C

Greater Winnipeg Water District

View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street

Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.

Greater Winnipeg Water District

View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street

Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R

Greater Winnipeg Water District

Results 141 to 160 of 183