Showing 177 results

archival descriptions
Greater Winnipeg Water District With digital objects
Print preview Hierarchy View:

View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street

Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R

Greater Winnipeg Water District

Only station woman on GWWD railway construction

Photograph of the only station woman for the construction of the Greater Winnipeg Water District Railway holding the hand of a child in front of a shelter, possibly near Shoal Lake. Photograph taken by C.J. Bruce, one of the Division Engineers for the Winnipeg Aqueduct.

Greater Winnipeg Water District

Backfilling section of aqueduct between Prawda and McMunn

Photograph of engineers standing next to a completed section of the Winnipeg Aqueduct being backfilled by a dragline, somewhere between Prawda, Manitoba, and McMunn, Manitoba. From left to right: Engineer of Design Maxwell V. Sauer (at aqueduct), Division Engineers George F. Richan and C.J. Bruce, and unknown. Photographer is unknown.

Greater Winnipeg Water District

Results 121 to 140 of 177