- i01229
- Item
- 1918
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
170 results with digital objects Show results with digital objects
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
Well excavation timbered to floor
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District
Driving Piles at Seine River Crossing of 66" Pipe Line
Contract 55 - Mile 4.4 - Driving piles at Seine River crossing of 66 inch pipeline. Note pipes.
Greater Winnipeg Water District
General View of Well Walls from Above
Contract 56 - Mile 3.5 - Red River Crossing - General view from concreting tower of walls of well structure (Taché surge tower).
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Buiilding of The James
Greater Winnipeg Water District
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R
Greater Winnipeg Water District
View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue
Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue. Looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of men mucking out trench for 48 inch diameter pressure pipe approx. at Sta. 80+00 on Pacific Avenue. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District
Concrete plant - Transcona, simultaneous pouring of two pipes
Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Simultaneous pouring of two pipes. Photo by T.H. Kirby.
Greater Winnipeg Water District
Screeding and floating inverts at Camp 4
Contract 33 - Mile 75 - Camp 4 - Screeding and floating inverts.
Greater Winnipeg Water District
Division 3A - Camp 6 - Class #14 Drag Line
Contract 34 - Mile 88.9 - Camp 6 - Bucyrus class 14 dragline. Panoramic view with image 747.
Greater Winnipeg Water District
Camp 9, mixer site opposite siding 8
Contract 33 - Mile 82 - Camp 9 - Mixer site opposite Siding 8, Glenn.
Greater Winnipeg Water District
Contract 34 - Mile 89 - Putting in box drains.
Greater Winnipeg Water District
Bending steel for inverts, Camp 3
Contract 30 - Mile 25 - Camp 3 - Bending invert steel reinforcing bars to template. Division 30 Engineer C.J. Bruce at center (hands on hips).
Greater Winnipeg Water District