Winnipeg in Focus is a database for archival descriptions and digital collections at the City of Winnipeg Archives.

Showing 1920 results

archival descriptions
Image With digital objects
Print preview View:
Intake - Filling last gap in cofferdam between the dykes, Viewed from West dyke
Intake - Filling last gap in cofferdam between the dykes, Viewed from West dyke
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Division 3A - Camp 6 - Class #14 Drag Line
Division 3A - Camp 6 - Class #14 Drag Line
Contract 32 - Mile 59 - Concrete aqueduct with packed backfill in place. Ready for machine placed backfill.
Contract 32 - Mile 59 - Concrete aqueduct with packed backfill in place. Ready for machine placed backfill.
Contract 55 - Concrete plant - Transcona, Simultaneous pouring of two pipes
Contract 55 - Concrete plant - Transcona, Simultaneous pouring of two pipes
Contract 33 - Dental Surgery at Siding 8, Mile 82
Contract 33 - Dental Surgery at Siding 8, Mile 82
July 5th 1916: Walking dredge, Camp 1, Mile 16
July 5th 1916: Walking dredge, Camp 1, Mile 16
Contract 33 - Camp 9 Mixer Site opposite Siding 8, Glenn
Contract 33 - Camp 9 Mixer Site opposite Siding 8, Glenn
July 5 1916: Bending steel for Inverts Camp 3, Mile 25
July 5 1916: Bending steel for Inverts Camp 3, Mile 25
Contract 34 - Mile 89 Putting in Box Drains
Contract 34 - Mile 89 Putting in Box Drains
Results 21 to 30 of 1920