- i02111
- Item
- 1916
Photograph is one of five photos mounted on page with caption "Assiniboine River flooded, Spring 1916."
70 results with digital objects Show results with digital objects
Photograph is one of five photos mounted on page with caption "Assiniboine River flooded, Spring 1916."
Rue De L'Hopital et Rue Langevin, St. Boniface Floods, April 1916
Postcard is a photographic print showing water flooding homes and other structures. Photograph taken by Advance Photo Company, Winnipeg. Azo mark appears in stamp box, made in Canada.
Man in boat rowing down residential street, 1916 Flood, Norwood
Photograph shows scene from the 1916 flooding of the Assiniboine River in Norwood, unidentified man rowing down residential street at center-left of photograph.
Party in Tunnel under Red River
Photograph of Greater Winnipeg Water District officials, engineers, and their families at the east end of the Winnipeg Aqueduct tunnel below the Red River linking downtown Winnipeg to St. Boniface. From left to right: Chief Engineer William G. Chace, Harriet Lily Waugh (née Logan), possibly Effie Waugh, and Division Engineer J. Armstrong. Photographer is unknown.
Greater Winnipeg Water District
Looking east over Red River trestle bridge
Photograph of a Red River trestle bridge between downtown Winnipeg and St. Boniface, looking east towards the Taché surge tower. Photographer is unknown.
Greater Winnipeg Water District
Pouring piers for Taché surge tower
Photograph of workers pouring piers for the Taché surge tower. Photographer is unknown.
Greater Winnipeg Water District
Excavated and timbered Taché surge tower
Photograph of workers excavating the Taché surge tower, which is timbered to the floor. Photographer is unknown.
Greater Winnipeg Water District
Aqueduct's route through St. Boniface
Photograph of the route of the Winnipeg Aqueduct's 66 inch diameter reinforced concrete pipeline, looking southeast towards where the Canadian Northern Railway line crosses Rue St. Joseph. Photograph taken from a concrete tower near the Taché surge tower by an unknown photographer.
Greater Winnipeg Water District
Driving piles into Seine River for aqueduct
Photograph of piles being driven into the Seine River for the Winnipeg Aqueduct, north of Provencher Boulevard. Photographer is unknown.
Greater Winnipeg Water District
Walls of Taché surge tower from above
Photograph of the walls of the Taché surge tower, still under construction, taken from a concreting tower. Photographer is unknown.
Greater Winnipeg Water District
Photograph of the Seine River crossing of the Winnipeg Aqueduct, taken from the Canadian Northern Railway tracks north of Provencher Boulevard and looking northeast towards Rue Notre Dame. Photographer is unknown.
Greater Winnipeg Water District
Passengers aboard GWWD Railway Service car at St. Boniface Station
Passengers aboard GWWD Railway Service car at St. Boniface Station. Image derived from glass lantern slide.
Greater Winnipeg Water District
Unloading of relief wood at Greater Winnipeg Water District Station
Men at the Greater Winnipeg Water District station in St. Boniface standing in front of horses hauling wood piles for relief work. Photograph taken by Robinson Studio.
Print contains two photographic images. One shows St. Boniface Cathedral and the Old Folks Home while the other shows an image of St. Boniface Hospital.
View looking west over Red River into downtown Winnipeg from St. Boniface
Photograph shows view of downtown Winnipeg, between Notre Dame Avenue East (Pioneer Avenue) and Lombard Avenue. Barge on the Red River also appears in photograph. Date of photograph is approximate, ca. 1930.
1932 Relief Works and Committee Winnipeg
Photograph collage of the 1932 Winnipeg Relief Works and Committee. Portraits of committee members are surrounding photographs of projects the committee had worked on. The committee members are, clockwise from top left: Alderman John Blumberg, Alderman H. Andrews, City Clerk Magnus Peterson, Alderman J.A. Barry, Alderman A.A. Ryley, Alderman W.B. Simpson, City Engineer W.P. Brereton, G.W. Northwood, Alderman E.D. Honeyman, Mayor Ralph Webb, Alderman J.A. McKerschar, A. MacNamara, Resident Engineer A.J. Taunton, Alderman L.F. Borrowman, and Alderman C.E. Simonite. The works projects showcased in the center are, clockwise from top left: the Main Street Bridge, the Norwood Bridge, the Assiniboine Park Bridge, the Winnipeg Auditorium, the Sargent Park Swimming Pool, and the Salter Street Bridge. Created by Robson Photo.
The Grotto, St. Boniface, Man.
St. Boniface Cathedral, St. Boniface
Junction of Red and Assiniboine Rivers, Winnipeg, Manitoba
Date of photograph is approximate, ca. 1940.
St. Boniface Basilica and the Assumption Monument
Photograph shows St. Boniface Basilica in background. The Assumption (monument) commemorating the saving of St. Boniface from the 1950 flood shown in foreground.