Alderman Midwinter and trenching machine at City well number 8
Lowering 36” City pipe line into trench
Lowering pipe into trench – City 36” pipe line
Excavating frozen earth at City pipe line
36” pipe – City pipe line
Excavating well number 8 for 36” City pipe line
City pipeline at well number 8
Digging trench for 36” City pipe line
View of City pipe line with 36” pipe
Connecting pipe – City pipe line
View of City pipe line
View of City pipe line and company’s camp
Digging trench for 36” City pipe line
Valve – 36” pipe line
Lowering 36” City pipe line under CPR subway crossing
Valve ready to be placed – 36” City pipe line
Floods from rain storm – City pipe line
Digging out pipe raised by rain
Laying 36” pipe under CPR subway
Lowering 36” City pipe line under CPR subway crossing