Showing 32 results

archival descriptions
Greater Winnipeg Water District fonds Labour
Print preview Hierarchy View:

31 results with digital objects Show results with digital objects

View of hoist lowering 48-inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street

Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.

Greater Winnipeg Water District

View of men mucking trench for 48-inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street

Contract 65 - Mile 3.2 - View of men mucking trench for 48 inch diameter Branch 1 aqueduct at Sta. 169+00 on Pacific Avenue, looking west between Louise Street and Main Street. Work progressed westward from the west tunnel shaft. Building of The James R

Greater Winnipeg Water District

Backfilling section of aqueduct between Prawda and McMunn

Photograph of engineers standing next to a completed section of the Winnipeg Aqueduct being backfilled by a dragline, somewhere between Prawda, Manitoba, and McMunn, Manitoba. From left to right: Engineer of Design Maxwell V. Sauer (at aqueduct), Division Engineers George F. Richan and C.J. Bruce, and unknown. Photographer is unknown.

Greater Winnipeg Water District

Results 21 to 32 of 32