Backfilling over aqueduct with dragline
- i01204
- Item
- 1915
Contract 30 - Mile 23 - Backfilling over aqueduct with dragline.
Greater Winnipeg Water District
Backfilling over aqueduct with dragline
Contract 30 - Mile 23 - Backfilling over aqueduct with dragline.
Greater Winnipeg Water District
View of bathing beach at Waugh, looking south along beach. Image derived from glass lantern slide.
Greater Winnipeg Water District
Bending steel for inverts, Camp 3
Contract 30 - Mile 25 - Camp 3 - Bending invert steel reinforcing bars to template. Division 30 Engineer C.J. Bruce at center (hands on hips).
Greater Winnipeg Water District
Contract 31 - Mile 40 - Brokenhead River siphon. West end of reinforced section.
Greater Winnipeg Water District
Bucyrus Class 7 dragline backfilling completed aqueduct
Contract 33 - Mile 71 - Bucyrus Class 7 dragline backfilling completed aqueduct. (l to r) Engineer of Design Maxwell V. Sauer (at aqueduct), Division 32 Engineer Geroge F. Richan, Division 30 Engineer C.J. Bruce, and Unknown.
Greater Winnipeg Water District
Camp 9, mixer site opposite siding 8
Contract 33 - Mile 82 - Camp 9 - Mixer site opposite Siding 8, Glenn.
Greater Winnipeg Water District
Chief Engineer W.G. Chase in arch
Contract 31 - Mile 43 - Chief Engineer W.G. Chace at completed arch.
Greater Winnipeg Water District
Concrete aqueduct with packed backfill in place
Contract 32 - Mile 59 - Concrete aqueduct with packed backfill in place. Ready for machine placed backfill.
Greater Winnipeg Water District
Concrete plant - Transcona, simultaneous pouring of two pipes
Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Simultaneous pouring of two pipes. Photo by T.H. Kirby.
Greater Winnipeg Water District
Contractor's Device for Moving Outside Forms
Contract 32 - Mile 57 - Contractor's device for moving outside arch forms.
Greater Winnipeg Water District
Contract 33 - Mile 82 - Dental surgery at Siding 8, Glenn.
Greater Winnipeg Water District
Division 3A - Camp 6 - Class #14 Drag Line
Contract 34 - Mile 88.9 - Camp 6 - Bucyrus class 14 dragline. Panoramic view with image 747.
Greater Winnipeg Water District
Drainage siphon (culvert) under aqueduct
Contract 31 - Mile 21.47 - Drainage siphon (culvert) under aqueduct. (Note: incorrect contract number on caption)
Greater Winnipeg Water District
Driving Piles at Seine River Crossing of 66" Pipe Line
Contract 55 - Mile 4.4 - Driving piles at Seine River crossing of 66 inch pipeline. Note pipes.
Greater Winnipeg Water District
Contract 33 - Mile 77.66 - East end of first Boggy River siphon at Sta. 4100+50.
Greater Winnipeg Water District
Excavating Channel - Indian Bay to Snowshoe Bay
Contract 36 - Falcon River Diversion Canal - Excavating channel from Indian Bay to Snowshoe Bay. Looking northwest toward Falcon Bay. Consulting Engineer James H. Fuertes right of dredge.
Greater Winnipeg Water District
Contract 15 - Mile 97.5 - Falcon River Diversion Dyke - Contractor Tomlinson & Fleming's camp at Indian Bay, looking southward from borrow pit. Panoramic view with image 35. Photo by Douglas L. McLean.
Greater Winnipeg Water District
Contract 15 - Falcon River Diversion Dyke - Method of placing material from cars into dump by use of scow. Photo by W.G. Chace.
Greater Winnipeg Water District
Forms for arch of sections 3 and 5
Contract 32 - Mile 57 - Forms for arch sections 3 and 5. Photo by W.G. Chace.
Greater Winnipeg Water District
General View of Well Walls from Above
Contract 56 - Mile 3.5 - Red River Crossing - General view from concreting tower of walls of well structure (Taché surge tower).
Greater Winnipeg Water District