Photographs
Add to clipboard
Forms part of Fonds 15. Series consists of photographs taken by GWWD employees during the building of the Greater Winnipeg Aqueduct that brings water from Shoal Lake to Winnipeg. Photos are made up of nitrate negatives and lantern slides.
Greater Winnipeg Water District
Falcon River Diversion Dyke
Add to clipboard
Contract 15 - Falcon River Diversion Dyke - Method of placing material from cars into dump by use of scow. Photo by W.G. Chace.
Greater Winnipeg Water District
Drainage siphon (culvert) under aqueduct
Add to clipboard
Contract 31 - Mile 21.47 - Drainage siphon (culvert) under aqueduct. (Note: incorrect contract number on caption)
Greater Winnipeg Water District
Excavating Channel - Indian Bay to Snowshoe Bay
Add to clipboard
Contract 36 - Falcon River Diversion Canal - Excavating channel from Indian Bay to Snowshoe Bay. Looking northwest toward Falcon Bay. Consulting Engineer James H. Fuertes right of dredge.
Greater Winnipeg Water District
Bucyrus Class 7 dragline backfilling completed aqueduct
Add to clipboard
Contract 33 - Mile 71 - Bucyrus Class 7 dragline backfilling completed aqueduct. (l to r) Engineer of Design Maxwell V. Sauer (at aqueduct), Division 32 Engineer Geroge F. Richan, Division 30 Engineer C.J. Bruce, and Unknown.
Greater Winnipeg Water District
Putting in Box Drains
Add to clipboard
Contract 34 - Mile 89 - Putting in box drains.
Greater Winnipeg Water District
Bending steel for inverts, Camp 3
Add to clipboard
Contract 30 - Mile 25 - Camp 3 - Bending invert steel reinforcing bars to template. Division 30 Engineer C.J. Bruce at center (hands on hips).
Greater Winnipeg Water District
Soil Test Section "E"
Add to clipboard
Contract 31 - Mile 40 - Soil test, Section "E". 6"x6", load 1000 pounds.
Greater Winnipeg Water District
Handmucking between the pole piling
Add to clipboard
Contract 34 - Mile 92.5 - Camp 7 - Slide at Sta. 4886. Hand mucking between the pole piling. (see image 900)
Greater Winnipeg Water District
Pouring piers
Add to clipboard
Contract 56 - Mile 3.5 - Red River Crossing - Pouring piers for well structure (Taché surge tower).
Greater Winnipeg Water District
Well excavation timbered to floor
Add to clipboard
Contract 56 - Mile 3.5 - Red River Crossing - Excavation for well structure (Taché surge tower) timbered to floor. 50' diameter excavation.
Greater Winnipeg Water District