Intake - View of unwatered cofferdam
- i01222
- Pièce
- 1918
Fait partie de Greater Winnipeg Water District fonds
Contract 35 - Mile 97.5 - Intake - View of unwatered cofferdam from Sta. 5152 in coffer.
Greater Winnipeg Water District
18 résultats avec objets numériques Afficher les résultats avec des objets numériques
Intake - View of unwatered cofferdam
Fait partie de Greater Winnipeg Water District fonds
Contract 35 - Mile 97.5 - Intake - View of unwatered cofferdam from Sta. 5152 in coffer.
Greater Winnipeg Water District
Intake - entrance showing channel, skimming, and front wall
Fait partie de Greater Winnipeg Water District fonds
Contract 35 - Mile 97.5 - Intake entrance showing channel, skimming and front wall. Looking westward.
Greater Winnipeg Water District
Excavating Channel - Indian Bay to Snowshoe Bay
Fait partie de Greater Winnipeg Water District fonds
Contract 36 - Falcon River Diversion Canal - Excavating channel from Indian Bay to Snowshoe Bay. Looking northwest toward Falcon Bay. Consulting Engineer James H. Fuertes right of dredge.
Greater Winnipeg Water District
Concrete plant - Transcona, simultaneous pouring of two pipes
Fait partie de Greater Winnipeg Water District fonds
Contract 55 - Canada Lock Joint Pipe, Ltd. precast pipe plant in Transcona. Simultaneous pouring of two pipes. Photo by T.H. Kirby.
Greater Winnipeg Water District
Driving Piles at Seine River Crossing of 66" Pipe Line
Fait partie de Greater Winnipeg Water District fonds
Contract 55 - Mile 4.4 - Driving piles at Seine River crossing of 66 inch pipeline. Note pipes.
Greater Winnipeg Water District
General View of Well Walls from Above
Fait partie de Greater Winnipeg Water District fonds
Contract 56 - Mile 3.5 - Red River Crossing - General view from concreting tower of walls of well structure (Taché surge tower).
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Forms part of Fonds 15. Series consists of photographs taken by GWWD employees during the building of the Greater Winnipeg Aqueduct that brings water from Shoal Lake to Winnipeg. Photos are made up of nitrate negatives and lantern slides.
Greater Winnipeg Water District
Camp 9, mixer site opposite siding 8
Fait partie de Greater Winnipeg Water District fonds
Contract 33 - Mile 82 - Camp 9 - Mixer site opposite Siding 8, Glenn.
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of mucking hoist dumping excavated material into dump wagon at Sta. 81+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing C
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing
Greater Winnipeg Water District
View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of contractor's plant at Sta. 79+00 on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (abatoir & pork packing) a
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of hoist lowering 48 inch diameter pressure pipe into trench at Sta. 79+50 on Pacific Avenue, looking east toward Xante Street. Mucking hoist in background. Work progressed eastward from Alexander Avenue at Yeomans Street.
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 65 - Mile 1.5 - View of mucking hoist hauling excavated material to dump wagon on Pacific Avenue, looking east toward Xante Street. Work progressed eastward from Alexander Avenue at Yeomans Street. Buildings of Western Packing Company Ltd. (aba
Greater Winnipeg Water District
Division 3A - Camp 6 - Class #14 Drag Line
Fait partie de Greater Winnipeg Water District fonds
Contract 34 - Mile 88.9 - Camp 6 - Bucyrus class 14 dragline. Panoramic view with image 747.
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 30 - Mile 16 - Camp 1 - Walking dredge excavating.
Greater Winnipeg Water District
Bucyrus Class 7 dragline backfilling completed aqueduct
Fait partie de Greater Winnipeg Water District fonds
Contract 33 - Mile 71 - Bucyrus Class 7 dragline backfilling completed aqueduct. (l to r) Engineer of Design Maxwell V. Sauer (at aqueduct), Division 32 Engineer Geroge F. Richan, Division 30 Engineer C.J. Bruce, and Unknown.
Greater Winnipeg Water District
Backfilling over aqueduct with dragline
Fait partie de Greater Winnipeg Water District fonds
Contract 30 - Mile 23 - Backfilling over aqueduct with dragline.
Greater Winnipeg Water District
Fait partie de Greater Winnipeg Water District fonds
Contract 31 - Mile 40 - Brokenhead River siphon. West end of reinforced section.
Greater Winnipeg Water District