Old St. James Bridge Approach
Old St. James Bridge Approach
Excavation, performed by unidentified man
Street cleaning machine from the Elgin Corp, May 1, 1953
Street cleaning machine from the Elgin Corp, May 1, 1953
No. 2 Hydrographs of 1950 Spring Flood levels of the Red River as recorded at various locations
No. 8 A portion of the Lyndale dike in Norwood with the Norwood Bridge in the background
Connection from hydrant to pipe
No. 9 Main Street at Portage Avenue showing a few of the many pumping units being used to pump out basements
No. 11 Flooding of the Pembina Highway underpass