Test Sections of Aqueduct at Exhibition Grounds
Ajouter au presse-papier
Contract 20 - Test Sections of Aqueduct - External load testing. Test sections of aqueduct were constructed at the Exhibition Grounds. Looking west toward McPhillips St.
Greater Winnipeg Water District
Greater Winnipeg Water District Photos
Ajouter au presse-papier
Consists of photographs taken by GWWD employees during the building of the Greater Winnipeg Aqueduct that brings water from Shoal Lake to Winnipeg.
Greater Winnipeg Water District
Brokenhead River siphon
Ajouter au presse-papier
Contract 31 - Mile 40 - Brokenhead River siphon. West end of reinforced section.
Greater Winnipeg Water District
Permeability Test Apparatus
Ajouter au presse-papier
Permeability test apparatus. Concrete test samples at lower left side.
Greater Winnipeg Water District
Drainage siphon (culvert) under aqueduct
Ajouter au presse-papier
Contract 31 - Mile 21.47 - Drainage siphon (culvert) under aqueduct. (Note: incorrect contract number on caption)
Greater Winnipeg Water District
Bucyrus Class 7 dragline backfilling completed aqueduct
Ajouter au presse-papier
Contract 33 - Mile 71 - Bucyrus Class 7 dragline backfilling completed aqueduct. (l to r) Engineer of Design Maxwell V. Sauer (at aqueduct), Division 32 Engineer Geroge F. Richan, Division 30 Engineer C.J. Bruce, and Unknown.
Greater Winnipeg Water District
East End of Siphon
Ajouter au presse-papier
Contract 33 - Mile 77.66 - East end of first Boggy River siphon at Sta. 4100+50.
Greater Winnipeg Water District
Putting in Box Drains
Ajouter au presse-papier
Contract 34 - Mile 89 - Putting in box drains.
Greater Winnipeg Water District
Soil Test Section "E"
Ajouter au presse-papier
Contract 31 - Mile 40 - Soil test, Section "E". 6"x6", load 1000 pounds.
Greater Winnipeg Water District
Walking dredge, Camp 1
Ajouter au presse-papier
Contract 30 - Mile 16 - Camp 1 - Walking dredge excavating.
Greater Winnipeg Water District