Dossier d00686 - Subsidiary Ledger, 1955-1959

Zone du titre et de la mention de responsabilité

Titre propre

Subsidiary Ledger, 1955-1959

Dénomination générale des documents

  • Document textuel

Titre parallèle

Compléments du titre

Mentions de responsabilité du titre

Notes du titre

Niveau de description

Dossier

Cote

d00686

Zone de l'édition

Mention d'édition

Mentions de responsabilité relatives à l'édition

Zone des précisions relatives à la catégorie de documents

Mention d'échelle (cartographique)

Mention de projection (cartographique)

Mention des coordonnées (cartographiques)

Mention d'échelle (architecturale)

Juridiction responsable et dénomination (philatélique)

Zone des dates de production

Date(s)

Zone de description matérielle

Description matérielle

Zone de la collection

Titre propre de la collection

Titres parallèles de la collection

Compléments du titre de la collection

Mention de responsabilité relative à la collection

Numérotation à l'intérieur de la collection

Note sur la collection

Zone de la description archivistique

Nom du producteur

(1912-1962)

Histoire administrative

The Greater Winnipeg Water District (GWWD) was incorporated in 1913 to supply water to the City of Winnipeg and surrounding municipalities. In May 1914, construction began on the aqueduct to bring water from Shoal Lake to Winnipeg. In March 1919, water from Shoal Lake flowed into Winnipeg’s taps and on September 9, 1919, His Royal Highness The Prince of Wales (The Prince Edward) dedicated the aqueduct. In 1935, the Greater Winnipeg Sanitary District (GWSD) was incorporated to manage wastewater collection and treatment for the participating sections of the GWWD. These two corporations existed until 1961, when their functions were taken over by the Metropolitan Corporation of Greater Winnipeg.

The GWWD was originally comprised of the City of Winnipeg, the City of St. Boniface, the Town of Transcona, the Rural Municipality of St. Vital, and parts of Fort Garry, Assiniboia, and Kildonan. By 1960, the area serviced by the GWWD also included parts of St. James and Tuxedo.

The GWWD had two boards: the Administration Board and the Board of Commissioners. The Administration Board had the policy-making function and was originally composed of the Mayor and four Councillors of the City of Winnipeg, the Mayor and one Councillor of the City of St. Boniface, the Mayor of Transcona, and the Reeves of the four other municipalities. The Administration Board’s Chairman was the Mayor of Winnipeg. The Board of Commissioners was responsible for operations and it had up to three members. Usually, the Board of Commissioners was composed of a Chairman, Treasurer and one other Commissioner. The Chairman was the City Engineer, and the Treasurer was the Commissioner of Finance of the City of Winnipeg. The third Commissioner was appointed by the Administration Board. A Board of Equalization, appointed by the Public Utilities Commissioner, was also established to determine the assessment levied on the taxable land in each municipality.

The aqueduct was largely built by three contractors, although the GWWD tendered and administered ninety-nine contracts during construction. The three main contractors were J.H. Tremblay Co. Ltd., Thos. Kelly & Sons, and the Winnipeg Aqueduct Construction Co. Ltd.

As no roads existed along the proposed route of the aqueduct, the GWWD created and operated the Greater Winnipeg Water District Railway to run parallel to the route to facilitate the movement of materials and workers. Construction of the railway track began in 1914 and was completed in 1915. The track runs from its terminus in St. Boniface to Waugh, Manitoba near Shoal Lake. After the aqueduct was completed, the railway was also used to carry freight and passengers in an effort to reduce the costs of construction. Freight included firewood, pulpwood, poles, railway ties, ice, mail, milk, gravel and sand. Although initially only three trains ran a week, at the peak of its operation up to four trains a day hauled gravel for use as an aggregate in concrete manufacture.

The first meeting of the GWWD Administration Board took place on July 30, 1913. By the fall of 1913, active work was underway and survey parties were determining the most economical route from Shoal Lake. As the waters of Shoal Lake are part of the Lake of the Woods, which crosses the boundary into the United States, it was necessary to secure the approval of the International Joint Commission. It was also necessary to secure the consent of the Ontario Government as the boundary line between the provinces of Manitoba and Ontario passes through Indian Bay, a tributary of Shoal Lake. Further sections of the aqueduct were located on reserve land belonging to Kekekoziibii Shoal Lake 40 First Nation and the sale of this land was required. The provisions of the Indian Act allowed for reserve lands to be sold with the price of the land set by the Governor in Council and the proceeds of the sale going to the Band. The Department of Indian Affairs valued three thousand acres of Kekekoziibii Shoal Lake 40 First Nation's reserve land at fifty cents per acre. Approximately fifty-five acres on the mainland were valued at three dollars an acre. As the Falcon River ran into the proposed intake area in Indian Bay, a diversion was built so that the waters of Falcon River, which had an unwanted colour, ran into Snowshoe Bay instead. The Falcon River diversion, consisting of a 2.4 km dyke and 840 m channel, solved the problem of unwanted colouration of the water supply, but had the effect of limiting Kekekoziibii Shoal Lake 40 First Nation's access to the mainland.

The City of Winnipeg Archives acknowledges the following sources:

City of Winnipeg, compiled by the City Clerk. Municipal Manual 1955. Winnipeg: Henderson Directories, [1955].

City of Winnipeg, Water and Waste Department, “The Greater Winnipeg Water District Railway.” Last updated June 29, 2018. Available: https://www.winnipeg.ca/waterandwaste/dept/railway.stm

Ennis, David A. “Developing a Domestic Water Supply for Winnipeg from Shoal Lake and Lake of the Woods: The Greater Winnipeg Water District Aqueduct.” Master’s thesis. University of Manitoba, 2011.

Special thanks to the Water and Waste Department for supplying key details.

Historique de la conservation

Portée et contenu

Zone des notes

État de conservation

Source immédiate d'acquisition

Classement

Series was condensed in 2019. Box numbers have changed.

Langue des documents

Écriture des documents

Localisation des originaux

Disponibilité d'autres formats

Restrictions d'accès

There are no restrictions on access to these records.

Délais d'utilisation, de reproduction et de publication

Researchers are responsible for observing Canadian copyright regulations.

Instruments de recherche

Instrument de recherche téléversé

Éléments associés

Éléments associés

Accroissements

Identifiant(s) alternatif(s)

Zone du numéro normalisé

Numéro normalisé

Mots-clés

Mots-clés - Sujets

Mots-clés - Lieux

Mots-clés - Noms

Mots-clés - Genre

Zone du contrôle

Identifiant de la description du document

Identifiant du service d'archives

Règles ou conventions

Statut

Niveau de détail

Dates de production, de révision et de suppression

Langue de la description

Langage d'écriture de la description

Sources

Zone des entrées

Sujets associés

Personnes et organismes associés

Lieux associés

Genres associés